The Demolition of the Missenden Building
Client: Sydney University
Description: A 5 storey brick, concrete
and timber framed building, was demolished adjacent an operating
hospistal and university campus. The demolition scope included
the divsersion of critical electrical, hydraulic, mechanical and
fibre optic services. Prior to demolition of the building the
internal hazardous materials including asbestos was removed. The
demolition was undertaken by large tracked excavators fitted with
hydralic "pulveriser" attachments. |